Can you walk on the W&OD trail?
Can you walk on the W&OD trail?
Parking/Access Points. The W&OD Trail runs 45 miles from Shirlington to Purcellville. There are numerous access points with parking, or users can simply walk on or off at a point of their choosing.
What does W&OD trail stand for?
Washington and Old Dominion Railroad Trail
The park’s primary feature is the Washington and Old Dominion Railroad Trail (abbreviated as W&OD Trail), an asphalt-surfaced paved rail trail that runs through densely populated urban and suburban communities as well as through rural areas.
How long is W&OD trail?
45-mile
The 100-foot-wide Washington & Old Dominion Railroad Regional Park (W&OD Trail) features a 45-mile asphalt trail for walking, running, bicycling and other activities and a 30.5-mile, parallel, gravel bridle path for horseback riding and hiking.
Is the W&OD trail flat?
Stretching nearly 45 miles from just outside of Washington, D.C. to western Loudoun County, Virginia, the W&OD Trail is an endurance athlete’s dream. The mostly flat trail, which is built on the old Washington & Old Dominion train line, serves as a crucial link between the nation’s capital and its western suburbs.
Where does the W and OD trail go?
The Washington & Old Dominion Trail (W&OD) is a 45-mile trail that stretches from Arlington County, all the way through Fairfax County, and into Loudoun County, ending in the town of Purcellville.
Where does the W and OD trail end?
Purcellville
The W&OD Trail begins in the Shirlington area of Arlington County, just off I-395 Exit 6. It ends “way-out” in rural Purcellville, VA. Along the way, it passes through quaint villages like Falls Church and Leesburg, and high-tech centers such as Reston and Herndon.
Are dogs allowed on W&OD trail?
Pets must be kept on a leash and under control at all times. Please place all trash in receptacles. The trail is open from 5:00am to 9:00pm from Shirlington in Arlington County, all the way to the western town limit of Herndon in Fairfax County. In other areas, the trail is only open during daylight hours.
Where does the Washington and Old Dominion trail start?
Shirlington
When was the W&OD trail built?
1974
The first segment of the W&OD Trail was opened in 1974 within the City of Falls Church. This portion was built as the result of a special agreement with VEPCO under which the Regional Park Authority was allowed to judge whether a trail of this sort would prove to be popular.
Where does the W and OD trail start?
Are electric bikes allowed in W&OD trail?
Arlington cyclists can now ride e-bikes on NOVA Parks trails, including the popular W&OD Trail, thanks to a new change in the rules.
How old is the W&OD trail?
The 100-foot wide Washington and Old Dominion Railroad Regional Park (W&OD) is one of the skinniest parks in the commonwealth of Virginia, but also one of the longest — 45 miles in length. The W&OD takes its name from the railroad whose trains ran along the right-of-way from 1859 until 1968.